Transfer Pump No. 2 Control Panel Rectification - THE SPIRIT

Iskaan Tech • dubai, dubai emirate • Posted July 15, 2026

About the Role

Transfer Pump No. 2 Control Panel Rectification - THE SPIRIT

Break Down Posted On: July 9, 2026 Closing On: July 13, 2026

JOB REFERENCE: JB

Scope of Work:

  • Supply and replace Panel Contactor 220V 03 Nos.
  • Supply and replace Auxiliary Contactor with Timer 02 Nos.
  • Supply and replace Overload Relay 01 No.
  • Supply and replace Pneumatic On-Delay Timer 01 No.
  • Supply and replace 63A MCCB (Moulded Case Circuit Breaker) 01 No.
  • Rectify the control panel fault by replacing the defective electrical components.
  • Test and commission the control panel to ensure proper operation.
  • Restore Transfer Pump No. 2 to normal operating condition.
  • Include all labour, materials, consumables, tools, testing, commissioning, and site cleaning required for the complete execution of the work.
  • ...