High Voltage- Project Manager
Samaiden Group • petaling jaya, selangor • Posted June 14, 2026
About the Role
1. Overall Project Ownership (Interconnection Scope)
- Lead and manage the full lifecycle of interconnection facilities:
- TNB substation / switching station
- HV/MV systems (11kV / 33kV / 132kV or higher)
- Transmission lines / underground cable systems
- Ensure delivery in line with project timeline, budget, and quality requirements .
- Develop and track detailed interconnection schedule aligned with overall COD milestones.
2. Authority & Stakeholder Management
- Act as primary interface with:
- Lead all submissions and approvals: Interconnection application, Design approvals and protection studies, Energization approvals (Borang G, H, etc.) , Chair/attend high-level technical and coordination meetings.
- Oversee and validate engineering deliverables: SLDs, protection schemes, cable sizing, routing Grid compliance studies (load flow, short circuit, protecti...