Construction Programme Lead - Resident Engineer (Bridge)

SMEC (an SJ Group company) • Remote, oos kaap • Posted July 15, 2026

About the Role

SMEC (an SJ Group company) is seeking a Senior Assistant Resident Engineer to oversee construction at the Msikaba River Bridge site in Eastern Cape. This role involves detailed programme monitoring, contract administration, and managing technical/contractual site aspects.

Candidates must have extensive experience with CCS Candy and a relevant engineering degree. The position requires 6 to 15 years in construction supervision, with at least 5 years on major infrastructure projects.

#J-18808-Ljbffr