BIM Manager – Data Centre Construction (JB/KL)

HR Exchange Pte Ltd. • Singapore, Singapore • Posted June 29, 2026

About the Role

Responsibilities:

  • Manage and coordinate BIM implementation throughout the project design and final model preparation.
  • Act as the primary contact for all BIM-related matters for assigned projects.
  • Ensure accuracy and completeness of the BIM Execution Plan.
  • Oversee updates to models, specialized models, and related databases.
  • Prepare drawing submission lists based on contract requirements.
  • Lead and supervise BIM Engineers to meet project timelines and standards.
  • Monitor drawing submissions and regularly update their status.
  • Support the Project Team with design changes, updates, and related issues.
  • Maintain and update all models, drawings, and documentation.
  • Attend BIM coordination meetings.
  • Requirements:

  • Minimum Diploma in Engineering or equivalent.
  • Minimum 7 years of experience in BIM modelling and coordination.
  • Certified in BIM modelling and man...